Spec for New Electrics
Written by admin on July 20, 2009 – 8:02 pm
Specification for New electrics at 8 piping close
Summary
An extension and utility room is being added to 8 Piping Close, and the sitting room is being renovated. The rest of the house will be significantly insulated to reduce heating costs.
A Solar photovoltaic installation is under consideration. A small system is planned to be installed on the [...]